Save
Busy. Please wait.
Log in with Clever
or

show password
Forgot Password?

Don't have an account?  Sign up 
Sign up using Clever
or

Username is available taken
show password


Make sure to remember your password. If you forget it there is no way for StudyStack to send you a reset link. You would need to create a new account.
Your email address is only used to allow you to reset your password. See our Privacy Policy and Terms of Service.


Already a StudyStack user? Log In

Reset Password
Enter the associated with your account, and we'll email you a link to reset your password.
focusNode
Didn't know it?
click below
 
Knew it?
click below
Don't Know
Remaining cards (0)
Know
0:00
Embed Code - If you would like this activity on your web page, copy the script below and paste it into your web page.

  Normal Size     Small Size show me how

Operations Mgmt

Prof. fandel: Chapter 10 Capacity Management

QuestionAnswer
Capacity The capability of a manufacturing or service resource such as a facility, process, workstation, or piece of equipment to acquire its purpose over a specified time period.
Capacity is determined by: By the resources available to organization (facilities, equipment, and labor) how they are organized, and their efficiency as determined by specific work methods.
Two ways to view Capacity: 1) As the maximum rate of output per unit of time. 2) As units of resource availability
Economies of Scale Are achieved when the average unit cost of a good or service decreases as the capacity and/or volume of throughput increases.
Diseconomies of Scale Occur when the average unit cost of the good or service begins to increase as the capacity and/or volume of throughput increases.
Focused Factory A way to achieve economies of scale without extensive investments in facilities and capacity by focusing on a narrow range of goods or services, target market segments, and/or dedicated processes to maximize efficiency and effectiveness.
Safety Capacity (Capacity Cushion) An amount of capacity reserved for unanticipated events, such as demand surges, materials shortages, and equipment breakdowns.
Average Safety Capacity (%) = 100% - Average resource utilization %
Capacity required (Ci) = Setup (Si) + [Processing Time (Pi) x Order Size (Qi)]
Revenue Management Systems (RMS) Consists of dynamic methods to forecast demand, allocate perishable assets across market segments, decide when to overbook and by how much, and determine what price to charge different customer classes. ex) Managing overbooking in airlines, hotels, etc.
Theory of Constraints (ToC) A set of principles that focuses on increasing total process throughput by maximizing the utilization of all bottleneck work activities and workstations.
Throughput Amount of money generated per time period through actual sales.
Constraint Anything that limits an organization from moving toward or achieving a goal.
Physical Constraint Associated with the capacity of a resource. ex) Machine, employee
Bottleneck Work Activity One that effectively limits capacity of an entire process.
Non-bottleneck Work Activity One in which idle capacity exists.
Non-physical Constraint Environmental or organizational ex) Low product demand or an inefficient management policy or procedure.)
Created by: KAzetapi
Popular Management sets

 

 



Voices

Use these flashcards to help memorize information. Look at the large card and try to recall what is on the other side. Then click the card to flip it. If you knew the answer, click the green Know box. Otherwise, click the red Don't know box.

When you've placed seven or more cards in the Don't know box, click "retry" to try those cards again.

If you've accidentally put the card in the wrong box, just click on the card to take it out of the box.

You can also use your keyboard to move the cards as follows:

If you are logged in to your account, this website will remember which cards you know and don't know so that they are in the same box the next time you log in.

When you need a break, try one of the other activities listed below the flashcards like Matching, Snowman, or Hungry Bug. Although it may feel like you're playing a game, your brain is still making more connections with the information to help you out.

To see how well you know the information, try the Quiz or Test activity.