click below
click below
Normal Size Small Size show me how
APM PMQ 7 S7
Glossary for APM Project Management Qualification
Term | Definition |
---|---|
CBS (Cost breakdown structure) | The hierarchical breakdown of a project into cost elements. |
Change control | The process through which all requests to change the approved baseline of a project programme or portfolio are captured, evaluated and then approved, rejected or deferred. |
Configuration | The functional and physical characteristics of a product as defined in its specification. |
Configuration item | A part of a configuration that has a set function and is designated for configuration management. It uniquely identifies all items within the configuration. |
Configuration management | Encompasses the technical and administrative activities concerned with the creation, maintenance, controlled change and quality control of the scope of work. |
Cost breakdown structure (CBS) | The hierarchical breakdown of a project into cost elements. |
PBS (Product breakdown structure) | A hierarchical breakdown of the products required to be produced by a project. |
Product breakdown structure (PBS) | A hierarchical breakdown of the products required to be produced by a project. |
Requirements | The stakeholders’ wants and needs clearly defined with acceptance criteria. |
Requirements management | The process of capturing, assessing and justifying stakeholders’ wants and needs. |
Scope | The totality of the outputs, outcomes and benefits and the work required to produce them. |
Scope management | The process whereby outputs, outcomes and benefits are identified, defined and controlled. |