Busy. Please wait.
Log in with Clever
or

show password
Forgot Password?

Don't have an account?  Sign up 
Sign up using Clever
or

Username is available taken
show password

Your email address is only used to allow you to reset your password. See our Privacy Policy and Terms of Service.


Already a StudyStack user? Log In

Reset Password
Enter the associated with your account, and we'll email you a link to reset your password.

3M Test

Enter the letter for the matching Answer
incorrect
1.
What are associated with equipment safety, e.g. failure to accomplish the step could result in damage to equipment?
incorrect
2.
What provides correct information to allow effective planning and estimating of deferred maintenance actions?
incorrect
3.
For non-automated sites, what ships maintenance action form is used to report a deferred maintenance action?
incorrect
4.
Examination of naval vessels is conducted as a what, which consists of operational tests or demonstrations of major systems and equipment?
incorrect
5.
The ships 3-M system consists of the Planned Maintenance System (PMS) along with what else and is the nucleus for managing maintenance aboard all ships and shore stations of the Navy?
incorrect
6.
What does a periodicity code of M mean?
incorrect
7.
What are basic PMS reference documents?
incorrect
8.
The division LCPO/LPO shall be qualified 3-M PQS up to what level?
incorrect
9.
Who shall pay particular attention to ensuring that the mechanisms to ensuring that the mechanisms to identify, document and correct material deficiencies identified by ships force or others are accurately reflected within the CSMP?
incorrect
10.
What aids managers by determining how efficiently the commands 3-M program is operating, and help identify areas with potential problems?
incorrect
11.
the deficiencies and recommendations that result from a PMT inspection and monitored maintenance are published in an engineering memorandum called what?
incorrect
12.
Who is responsible for evaluating and resolving errors in the CSMP?
incorrect
13.
Who are responsible for informing applicable TYCOMs/Fleet Commanders if the SLR data is not being received?
incorrect
14.
What type of maintenance action is not expected to be accomplished by ships force within the time frame prescribed by the TYCOM?
incorrect
15.
What meeting will be coordinated following each FLEETMER to identify strengths and weaknesses of the process?
incorrect
16.
The maintenance procedures developed in accordance with what principles for planned maintenance are the minimum required to maintain equipment within specifications?
incorrect
17.
The value contained in the _____ controls wether an individual equipmentrecord is regarded as an SLR record?
incorrect
18.
What does an inactive equipment maintenance code of LU mean?
incorrect
19.
What maintenance documents are those documented actions required to restore a system/ equipment to an operational condition within predetermined tolerances or limitations?
incorrect
20.
What symbol, following the periodicity code indicates a safety of ship item?
A.
Cautions
B.
Assist Visit
C.
Reliability-Centered Maintenance (RCM)
D.
CSMP
E.
Material inspection (MI)
F.
ISIC
G.
Lay up
H.
MIPs
I.
Asterisk (*)
J.
SEI
K.
Unscheduled
L.
Maintenance Data Systems (MDS)
M.
OPNAV 4790/2K
N.
(OSAR) On Site Analysis Report
O.
DIVO
P.
Lessons Learned
Q.
3M Coordinator
R.
Deferred
S.
SYSCOMs
T.
Monthly
Type the Answer that corresponds to the displayed Question.
incorrect
21.
What delineates how frequently the maintenance requirements must be performed?
incorrect
22.
Who is responsible to the division officer via the LCPO/LPO for the effective operation of the 3-M system within their respective work center?
incorrect
23.
How many months prior to the start of overhaul (SOH) will the responsible Regional Maintenance Center (RMC) initiate a letter of request to NAVSEALOGCEN Det Norfolk/San Diego as appropriate for a PMS update package?
incorrect
24.
What are used to report problems and also to request PMS coverage for newly installed systems or equipment?
incorrect
25.
What is a finite period of time usually corresponding to a patrol period for SSBN's or aligned with maintenance availabilities taking the IDTC into account for the SSN's?
incorrect
26.
What symbol indicates that this procedure is intended to be scheduled and performed by either ships force or off-ship maintenance personnel?
incorrect
27.
What tasks shall be used to call out use of the common assessment procedure included in the appropriate CMP's?
incorrect
28.
What was established by congress as a board to periodically examine naval vessels and make recommendations to the secretary of the navy if any should be stricken from the Naval Vessel Register?
incorrect
29.
What does an inactive equipment maintenance code of SU mean?
incorrect
30.
What maintenance actions ensure that equipment is in a condition suitable for operation or to reactivate an equipment or system that has been inactivated for prolonged period?

Embed Code - If you would like this activity on your web page, copy the script below and paste it into your web page.

  Normal Size     Small Size show me how
Created by: depalma