Save
Busy. Please wait.
Log in with Clever
or

show password
Forgot Password?

Don't have an account?  Sign up 
Sign up using Clever
or

Username is available taken
show password


Make sure to remember your password. If you forget it there is no way for StudyStack to send you a reset link. You would need to create a new account.
Your email address is only used to allow you to reset your password. See our Privacy Policy and Terms of Service.


Already a StudyStack user? Log In

Reset Password
Enter the associated with your account, and we'll email you a link to reset your password.
focusNode
Didn't know it?
click below
 
Knew it?
click below
Don't Know
Remaining cards (0)
Know
0:00
Embed Code - If you would like this activity on your web page, copy the script below and paste it into your web page.

  Normal Size     Small Size show me how

ET1 U1 L6

How To Implement The Installation Of An Electronics Equipment And/Or System

QuestionAnswer
What is a "Change to form" Any Change that affects the weight, balance, or movement of inertia of a component.
What is an Operational Requirements Document (ORD) A top-level decision document which establishes the minimum acceptable standards of performance and optimum performance goals for an asset.
What form must be submitted with a draft TCTO CG-22
Any draft TCTO that proposes an improvement to an asset's operational capability must be accompanied by a _______. ORD (Operational Requirement Document)
Which section of the TCTO draft document contains the amplifying information? Body
What is the purpose of TCTOs? REquired for configuration change proposals. Change to form, fit and function.
How are TCTOs initiated? By submitting form CG-22 with an attached draft TCTO.
Step 1 of TCTO process? Idea
Step 2 of TCTO process Submit draft TCTO with CG-22 to be endorsed.
Step 3 of TCTO process An improvement in operational capability must be accompanied by an Operational requirements Document (ORD)
Step 4 of TCTO process Shall contain as much of this info: Application, purpose, TCTO coordinator, when to be accomplished, by whom to be accomplished, what is required, how work is accomplished, supplemental information, records.
Step 5 of TCTO process Product line receives the cg-22 and draft TCTO and forwards to prime unit for initial validation.
Step 6 of TCTO process Product line engineering section enters scanned copy of cg-22 and draft TCTO into SFLC central projects database for tracking purposes. There are more steps to TCTO process that are not covered in the course guide.
Created by: filoblack
Popular Military sets

 

 



Voices

Use these flashcards to help memorize information. Look at the large card and try to recall what is on the other side. Then click the card to flip it. If you knew the answer, click the green Know box. Otherwise, click the red Don't know box.

When you've placed seven or more cards in the Don't know box, click "retry" to try those cards again.

If you've accidentally put the card in the wrong box, just click on the card to take it out of the box.

You can also use your keyboard to move the cards as follows:

If you are logged in to your account, this website will remember which cards you know and don't know so that they are in the same box the next time you log in.

When you need a break, try one of the other activities listed below the flashcards like Matching, Snowman, or Hungry Bug. Although it may feel like you're playing a game, your brain is still making more connections with the information to help you out.

To see how well you know the information, try the Quiz or Test activity.

Pass complete!
"Know" box contains:
Time elapsed:
Retries:
restart all cards