click below
click below
Normal Size Small Size show me how
Block lll, Unit 2
AF Management Engineering Program Overview
Question | Answer |
---|---|
Who creates the standards for manpower studies that apply to more than one MAJCOM? (2-2) | Air Force studies |
Who creates the standards for manpower studies that apply to just one MAJCOM? (2-2) | MAJCOM studies |
What are 3 reasons for using an assessment rather than a complete study? (2-2) | 1) a lack of experience w/i new system makes a formal study impractical (2) the standard would be short-lived due to a system that is approaching phase-out (3) to determine the initial impact of a new mission |
Which phase of the Manpower Standard Development Process has the primary objective of determining the viability & timing for proceeding with the process? (2-3) | Feasibility (Phase 1) |
Which phase of the Manpower Standard Development Process provides in-depth background knowledge & related functional info needed to identify potential process improvements & to design the best approach? (2-3) | Familiarization (Phase 2) |
Which phase of the Manpower Standard Development Process determines the Process Oriented Description (POD), identifies the Statement of Conditions (SOC), and identifies the work load factors (ie the X factors)? (2-3) | Study Design (Phase 3) |
Which phase of the Manpower Standard Development Process produces an end result of selecting a model/equation for use in the new manpower standard which is used to determine the number of requirements? (2-5) | Analysis (Phase 5) |
Who creates the standards for a unit with a unique mission? (2-2) | Single location studies |