click below
click below
Normal Size Small Size show me how
3E051 Set C Book 1
Question | Answer |
---|---|
The most important thing to keep in mind during readiness training is | that the reason for our existance is to do our mission |
Prime Base Engineer Emergency Force was created to | respond to worldwide contingency taskings |
How do GeoBase services provide "fused installation picture?" | Combining Common Installation picture and Mission Data Set layers |
The present Civil Engineering squadron format was adapted to | streamline functions and responsibilities |
The Civil Engineering squadron commander is normally referred to as the | base civil engineer |
Real property accounting is the responsibility of which flight? | resources |
Which is the largest flight in Civil Engineering in terms of personnel? | Operations |
A zone manager documents minor maintenance and repair work on | AF form 1219, BCE Multi-Craft Job Order |
The largest single element under the operations flight is | heavy repair |
Who is in the best position to maintain good rapport with Civil Engineering's customers | the workers |
One definition of urgent-type work is work that | eliminates fire, health, and safety hazards |
The type of work request in which labor or materials or both are "donated" by the requestor is | self-help |
Initially determining whether a work request (AF Form 332) could have an environmental impact is done by the | zone representative during the review process |
The accomplishment of self-help work orders is ultimately the responsibility of the | base civil engineer |
Who inspects work for quality and completion, and furnishes signed AF Form 327 to maintenance Engineering section? | Work center supervisor |
Which of the following is not a good supply discipline rule? | Over purchase supplies to keep more than adequate stock |
The first four digits of a national stock number identify the | stock class of the item |
Which of the following forms limit your request to 12 separate items? | AF Form 1445, Materials and Equiptment list |
Which of the following forms is used to order material not previously issues a stock number? | DD Form 1348-6, DOD Single Line Item Requisition System Document |
Materials used on a routine basis, such as screws, nuts, bolts, or lumber, are kept in the | bench stock area |
Which of the following is not a function of Logistics? | Updating CE customers regarding material delivery dates for certain jobs |
The main objective of the Air Force warranty/gaurantee program is to | make sure of the purchase of high-quality products and prolong their productive life |
How is warranted/gauranteed Air Force equipment identified? | by attaching an Optional Form 274, Equipment Warranty, to the equipment |
The purpose of the reoccuring work program is to | extend the life of Air Force facilities and equipment |
Reoccuring work program schedules are printed on a | weekly basis |
Which of the following is given to the journeyman when reoccuring work program work is done? | The maintenance action sheet |
Who selects and monitors the performance of the reoccuring work program's program managers in the electrical, mechanical, and structural disciplines? | the maintenance engineering foreman |
Task intervals on a Maintenance Action Sheet indicate | how frequently a task occurs |
The scheduling concept is a twofold operation consisting of filling out the | AF Form 561 (weekly schedule) and AF Form 1734 (daily schedule) |
The main difference between exception time accounting (ETA) and actual time accouting (ATA) shops is that | ATA shops are primarily in Operations flight and report their hours weekly |
Which statement is true concerning direct and indirect labor utilization codes? | Direct LUCs show "productive" labor hours, such as Prime BEEF |
Who develops the weekly work schedule (AF Form 561)? | supervisor |
What constitutes a schedule deviation from the weekly work schedule? | failure to start or complete a job as planned |
Who releases work to workers and logs the work on the daily work schedule (AF Form 1734)? | scheduler |
The purpose of the daily work schedule (AF Form 1734) is to show the status of each job and the | location of each worker |
Due to system transistions, what CE Management computer software packages may be used within the organizations? | IWIMS and ACES |
What type of files are maintained in IWIMS data files? | All raw data or information |
The most important technique you can employ when planning jobs is to | visit the job site to get a better understanding of the magnitude of the job |
Listing the order of work accomplishment by specific trade is called | craft phasing |
What are the two main types of Air Force publications? | departmental and field |
Which type of publication applies to a minimum of two major commands? | departmental |
Air Force publications were renamed and renumbered to | ease the process of information retrieval |
Which type of Air Force publication is identified by the name of the base followed by the publication number (SAFB Instruction 32-7040)? | Installation |
Which type of nondirective publication is informational and serves to guide, point out, or otherwise facilitate reference to other publications? | Air Force indexes |
Air Force "Aim High" recruitment posters are a good example of Air Force | temporary visual aids |
The series number for civil engineering publications is | 32-XXXX |
How many methods does the Master Catalog offer for locating publications? | 4 |
When a commercial technical publication is filed with regular TOs, how is it identified? | an identifying title sheet is filed in from of the commercial publication |
How do you file commercial publications that are purchase locally? | on a designated shelf file, in some logical order |
Engineering technical letters apply to | all facilities except medical and family housing |
Which section of the Opercation and Service Instructions Manual contains instructions for uncrating, installing and preparing equipment for initial operations? | section 3 |
Which setion of the Operation and Service Instructions Manual contains step-by-step instructions for starting, operating, and stopping equipment? | section 4 |
Which time compliance technical order requires you to discontinue use of equipment until prescribes maintenance work is completed? | immediate action TCTOs |
The time compliance technical order that must be issued if the risk involved is tolerable only within definite time limits is the | urgent action TCTO |
What is the first number of all technical order indexes? | zero (0) |
Which technical order improvement recommendation requires action within 40 days of its receipt? | urgent |
What type of technical order improvement recommendation is submitted if prescribed by maintenance procedures reduce the operational life of equipment? | Routine |
Some sort of training documentation must be kept on airmen in the grades of | AB through SMSgt |
Maintaining an AF Form 623, Individual Training Record, is mandatory for airmen in the grades of | AB through TSgt |
The current program used to record training in the field is known as the | Career Field Education and Training Plan |
Newcomers who already possess training records from another base are evaluated | only for previously certified tasks done at their present base |
Certifying officials for each section are assigned by the | unit commander |
Who evaluates the trainee and verifies that he/she has completed all upgrade training requirements? | certifying official |
What is the most common training medium of the CerTest program? | video |
The purpose of the Air Force classification system is to | identify job taskings and match them to an individual's abilities |
The job describtion gives a summary of duties and responsibilities for all personnel in a specific | AFSC |
Suffixes attached to an Air Force specialty code (AFSC) are used mainly | to designate special experience with one major equipment item |
The best descriptor of "career advancement" in the Air Force is | having skill levels commensurate with your grade |
In any specialty, what is a 1-level considered in the Air Force? | unskilled |
Which training responsibility is most important during skill-level upgrade training? | budget time on and off duty for CDC completion |
The first person to talk to if you do not understand your training plan is | your supervisor |
Placing safety suggestions on the bulletin board and passing safety literature to each worker are examples of which type of mishap prevention method? | education and training |
How often will supervisors review safety lesson plans? | annually |
What computer code reflects supervisor safety training completion? | code "Q" |
Information showing the location of installed distribution equipment should be kept | on a distribution map in the shop |
System problems, such as outages, surges, or low voltages, are recorded on the | power outage log |
Who is responsible for planning jobs that are to be done "hot"? | The electrical systems supervisor |
How can supervisor ensure crewmember understands the requirements presented during a tailgate meeting? | have personnel repeat procedures |
Which Air Force form is used to record all blocking and tagging actions done on primary electrical circuits on Air Force installations? | AF Form 269, Electrical Facilities Safe Clearance |
Who is responsible for issuing a safe clearance? | Superintendent |
The signature of the electrical supervisor in the "Released By" block of the safe clearance for certifies that | all personnel and temporary grounds are clear and all lines and equipment are ready for service |
From who/ where must you get radio clearance before entering the active runway? | control tower |
What is the first step you should take in a pole-top rescue? | Evaluate the situation |
When rescuing a person from a manhole, your primary concern should be | your own safety |
Which of these should you use with the manhole guard when using the two-person method of manhole rescue? | windlass handcrank |
When setting up the bucket truck for rescue, where should you place the strap, and how far from the bucket should it be? | the upper boom; 10 feet |
Most findings of No Significant Impact must not exceed | two typewritten pages |
To raise state and local awareness of the potential for accidents involving hazardous substances, the Environmental Protection Agency established the | Chemical Emergency Preparedness Program |
By law, in the case of the release of predetermined amounts of hazardous chemicals, teh facility must notify the community and the | Local Emergency Planning Committee and the State Emergency Response Committee |
To whom does the assessment team provide an in-brief at the start on the Environmental Compliance Assessment and Management Program visit? | Environmental Protection Committee |
Who is responsible for ensuring that Resource Conservation and Recovery Act (RCRA) requirements for the use of a Hazardous Waste Management Program are complied with? | Installation commander |
What is the maximum amount of time hazardous waste can be stored at an accumulation point before it is turned over to the Defense Reutilization and Marketing Office? | 90 days |
How does asbestos usually enter the body? | By being inhaled |
When are you most likely to encounter asbestos? | during renovation of old structures |
Which of the following is not considered as a mahor source of lead exposure in children? | Leaded gasoline engine emissions |
The primary purposes of a Lead Toxicity Investigation Team are to identify the source of lead exposure to an affected patient and provide | hazard evaluation and recommend potential corrective action |
What symptom appears when an individual has ahd prolonged skin contact with polychlorinated biphenyl? | chloracne |
When medical aid is not immediately available, what first aid should you give to an individual who has swallowed polychlorinated biphenyl? | give the victim large amounts of salt water |
A transformer that contains polychlorinated biphenyl (PCB) in greater concentrations than 500 parts per million is considered | PCB electrical equipment |
If the service equipment to a food storage facility is found to be PCB-filled, how often thereafter must you inspect this equipment? | weekly |