click below
click below
Normal Size Small Size show me how
3E351A1
CDC
Question | Answer |
---|---|
(001) Who is usually the highest-grade civilian in the civil engineer squadron? | Deputy base civil engineer. |
(001) The second-highest ranking officer in the squadron commands which civil engineer flight? | Operations. |
(001) What position within the fire department does the base civil engineer occupy? | Base fire marshal. |
(002) Which of the following is not part of CE’s wartime mission? | Operate, maintain, and protect infrastructure and facilities. |
(002) Prime BEEF’s first objective is to | organize, train, and equip CE forces to support Air Force combat operations. |
(002) Which description best fits RED HORSE’s function? | Conducts heavy engineering operations as independent self-sustaining units. |
(002) When not mobilized, which unit is under the authority of a state governor? | Air National Guard. |
(002) Who is responsible for providing contingency, operations, and technical support to Air Force installations and civil engineers worldwide? | Air Force Civil Engineer Support Agency. |
(003) When is the 3-skill-level awarded? | Upon graduating the Structural Apprentice Course. |
(003) What is the minimum number of months of on-the-job training required for the award of the 5-skill-level? | 15 |
(004) What GeoBase support environment provides senior planners and airmen with new intelligence enabling improved forward operating location selection, Time-Phased Force and Deployment Data planning, and accelerated bed down? | GeoReach Process. |
(004) What are geospatial data layers that support one or more functional communities’ specific missions or processes? | Mission data sets. |
(005) Which individual is the trainee’s first line of feedback where they first seek help for specific training needs? | Trainer. |
(005) Which of the following skill levels are allowed to task certify? | 5- and 7-skill-level. |
(005) What person plans and schedules shop training and identifies position qualification and skill level upgrade requirements? | Supervisor. |
(005) What person identifies core task, third-party certification, and other unique specialized certification requirements to provide mandatory 3/5/7-skill-level in resident courses? | Air Force career field manager. |
(006) Your work center training program should be tailored to the needs of the | mission first, then the needs of the people. |
(006) Which type of training contributes directly or indirectly to mission attainment but is separate from the requirements of an individual’s primary Air Force specialty. | Ancillary. |
(006) In the training program area, which term identifies the lowest level of behavior that describes the complete performance of a meaningful function? | Task. |
(007) What training prioritization code is used if training not provided will ultimately cause some mission impairment? | Code C. |
(007) What form is used to request training for active duty military? | AF Form 403. |
(008) The CerTest program is broken into the following four categories: AFSC specific, | supplemental training, CE general, and contingency. |
(008) How many times can you take the CerTest pre-test for each subject area? | Unlimited. |
(008) Where should you look to see if there is a certification requirement for your job? | Master task list. |
(009) What does not help you establish your image with a customer? | Impress your customer with your job knowledge. |
(010) Which Air Force form do building custodians and military family housing occupants use to identify work to CE? | 332, BCE Work Request. |
(010) Within how many hours from notification must all emergency work (direct scheduled work) either be completed or downgraded? | 24 |
(010) What type of work order accomplishes the project with civil engineer manpower? | In-house. |
(011) What recurring work program term refers to the description of work needed? | Scope. |
(011) At what level are the hours for the recurring work program identified and reserved? | Shop level. |
(011) How often are recurring work program schedules printed for each foreman to verify, review, and schedule work? | Weekly. |
(012) What part of the comprehensive plan provides detailed information in the form of graphics, textual data, narrative, and maps that focus on specific functional areas? | Component plans. |
(012) What part of the comprehensive plan includes the databases, documents, and graphics required for other Air Force programs? | Special plans and studies. |
(012) What part of the comprehensive plan are the informational databases that graphically depict features, such as unique natural and cultural resource boundaries? | Maps. |
(013) What is one of the keys to programming facility requirements properly? | Work classification. |
(013) What customer is reimbursable to CE? | Reserves. |
(013) What are the two methods used for doing work for reimbursable customers? | Reimbursement and direct cite. |
(014) Step-by-step procedures for a particular job that are listed in the correct sequence for accomplishing the tasks are called | job phases. |
(014) In what type of phasing do you list the sequence in which the trade appears on the job site? | Craft phasing. |
(014) When planning a project, what item is used to compute the total job time for each phase using engineered performance standards? | Job planning and estimating worksheets. |
(015) The Air Force uses the in-service work plan to program work requirements over a | 12-month period. |
(015) Under what time accounting method(s) do shops report to a scheduler the actual number of hours worked on each job? | Actual time accounting only. |
(015) Under what time accounting method(s) is it assumed that people are working a normal 8-hour day | Exception time accounting only. |
(016) What do you need before you can access the Interim Work Information Management System? | A Logon ID, password, computer with VUWin, and access to local area network. |
(016) What attributes are not conventions of the Interim Work Information Management System (IWIMS)? | Password requirements. |
(016) What file types are used to create a report in the Interim Work Information Management System? | Data and control. |
(017) Under the Government Purchase Card program, who is ultimately responsible for the proper and correct administration of the program within his/her office? | Approving official. |
(017) Which of the following purchases is authorized to be made with the Government Purchase Card? | A $2,000 construction project. |
(018) How often are documents selected for warranty or guarantee enforcement reviewed? | Quarterly. |
(018) Who maintains warranty and guarantee information on items of equipment installed by the operations flight? | Operations work centers. |
(018) Who sends the warranty or guarantee documents to the applicable operations shop for items received from base supply and installed by the operations shops? | Logistics function. |
(019) Who is responsible for instructing their people how to comply with Air Force regulations governing property? | Supervisors. |
(019) Who is responsible for indoctrinating their people in the principles of supply discipline?? | Supervisors. |
(020) What are the three principal accident prevention methods? | Physical modification, education and training, and enforcement of safety standards. |
(020) Placing safety suggestions on the bulletin board and passing safety literature to each worker are examples of which type of accident prevention method? | Education and training. |
(020) How often should supervisors give new workers a safety briefing? | Daily. |
(020) If a worker does not seem to understand the procedures for an assigned task, what should the supervisor do? | Have the worker state the procedures. |
(021) What procedure must your supervisor follow when a new task is introduced into the workplace and the task is not governed by a technical order or other definitive guidance? | Conduct a job safety analysis. |
(021) At what height must you install guards on machinery with exposed moving parts, such as flywheels, pulleys, and chains? | Eight feet or less from floor. |
(021) What must you do before cleaning or adjusting a power tool? | Disconnect it from its power source. |
(021) When performing lockout/tagout procedures, what must you do if the equipment to be locked out is still operating? | Shut it down using the normal stopping procedures. |
(021) When implementing fall protection, you must use it anytime you work on an area where the potential to fall exists from a height of | 10 feet. |
(022) How many feet above the roof eave must a ladder extend before you use it? | 3. |
(022) To prevent tipping when erecting a scaffold, the scaffold should never exceed what height without being secured? | Four times its minimum base dimension. |
(022) You must install toprails in a scaffold guardrail system at what height range (minimum – maximum) above the work platform? | 38 – 45 inches. |
(022) When working on a mobile work platform, where must workers attach their safety harnesses? | Work platform only. |
(023) Who is responsible for ensuring compliance with all Resource Conservation Recovery Act requirements on an installation? | Installation commander. |
(023) Who receives disposition instructions when hazardous materials enter an Air Force base? | The user of the materials. |
(023) What type of asbestos product poses the greatest risk? | Pipe insulation. |
(024) What Environmental Compliance Assessment and Management Program phase includes a review of all relevant regulations, instructions, and directives for the installation? | Pre-assessment activities. |
(024) During what Environmental Compliance Assessment and Management Program phase does the assessment team compile all the environmental findings, with suggested corrective actions, into a preliminary findings report? | Post-assessment activities. |
(025) The National Environmental Policy Act process is intended to help public officials make decisions based upon | environmental consequences. |
(025) Which action qualifies for a categorical exclusion under the Environmental Impact Analysis Process? | Repairing and replacing real property installed equipment. |
(002) The best way to provide the readiness to respond with an engineering capability in wartime is by | exercising during peacetime. |
(006) When conducting training, what document is a time-phased schedule that implements the training program? | Training plan. |
(021) When using lanyards in personal fall arrest systems, you must secure them from above where you’ll be working and not allow for a fall of more than | 6 feet. |
(026) What type of publication applies to a minimum of two major commands or field operating agencies? | Departmental. |
(027) What civil engineer publication does the Air Force Civil Engineer Support Agency manage? | Engineering technical letters. |
(027) Engineering technical letters are developed to | maintain high professional standards in facility engineering and design. |
(027) Who determines the need for Air Force engineering technical letters? | The Civil Engineer. |
(027) Who is the source for Air Force publication engineering technical letters? | Air Force Civil Engineer Support Agency. |
(028) What type of technical order has detailed information needed for equipment operation, maintenance, inspection,installation, and overhaul? | Operation and maintenance. |
(028) What type of technical order includes data extracted from some other document, such as another TO? | Abbreviated. |
(028) When an unsafe condition that may result in a fatal accident, severe injuries, or destruction of the equipment exists, what type of technical order is issued? | Time compliance. |
(029) Where do we get manufacturer technical instructions for equipment or work procedures for which there are no technical orders? | Commercial publications. |
(029) Which publication system incorporates some commercial publications? | Technical orders. |