Save
Busy. Please wait.
Log in with Clever
or

show password
Forgot Password?

Don't have an account?  Sign up 
Sign up using Clever
or

Username is available taken
show password


Make sure to remember your password. If you forget it there is no way for StudyStack to send you a reset link. You would need to create a new account.
Your email address is only used to allow you to reset your password. See our Privacy Policy and Terms of Service.


Already a StudyStack user? Log In

Reset Password
Enter the associated with your account, and we'll email you a link to reset your password.
focusNode
Didn't know it?
click below
 
Knew it?
click below
Don't Know
Remaining cards (0)
Know
0:00
Embed Code - If you would like this activity on your web page, copy the script below and paste it into your web page.

  Normal Size     Small Size show me how

Blueprint Schedules

Lesson 5: Interpreting Blueprint Schedules and Locating Components on the Print

QuestionAnswer
1. The IBEW building is located at ? and Gateway Boulevard in Pittsburgh, Pa. Carson Street - E1.1
2. What is the name of the city electrical utility company designated as D.L. on the prints? Duquesne Light Company - E1.1
3. The service duct bank between the D.L. pad mount transformer and the main electrical switchboard consists of ? four-inch conduits. 9 Four Inch Conduits - E1.1
4. How deep is the service duct bank measured from finish grade to the top of the concrete encasement that runs between the D.L. pad mount transformer and the main electrical switchboard? 2' 6" - E1.1
5. There is/are ? spare conduit(s) in the duct bank between the D.L. pad mount transformer and the main electrical switchboard. 1 Spare 4" - E1.1
6. What must the electrician place 12 inches below finish grade and above the duct bank encasement to prevent accidental digging into the electrical service conduits between the D.L. pad mount transformer and the main electrical switchboard? A detectable marker tape - E1.1
7. Where should the electrical contractor intercept the existing primary underground electrical conduits? Adjacent to Gateway Boulevard - E1.1
8. The main distribution switchboard is located on the first level of the Training Center Building in Room ? . 129 - AT2.1
9. What are the length, height, and depth dimensions of the main switchboard? 11' 6" × 7' 6" × 3' - E5.1
10. What size main breaker is used on the feed for the office building? 1,600 A, 3-pole, 480Y/277 V - E5.1
11. Using E5.1 Riser, how are the transformers supplied from floor to floor in the office building? Bus duct - E5.1
12. Fourth floor panelboard DPO4L is ? mounted with mains supplied from the ? . surface / top - E1.2
13. Fourth floor panelboard DPO4L is protected by a ? circuit breaker. 400-A, 3-pole circuit breaker - E1.2
14. Fourth floor panelboard DPO4L has a voltage rating of ? . 208/120 V, 3-phase, 4-wire - E1.2
15. Lighting fixture Type S3 is shown on Floor Plans EO2.1 (1 of 4) and EO2.1 (2 of 4), located on the first level of the office building. The Type S3 uses a ? lamp and ballast. 175-W metal halide 277-V - E1.3
16. Lighting fixture Type S3 is shown on Floor Plans E02.1 (1 of 4) and E02.1 (2 of 4), located on the first level of the office building. The S3 light fixture (luminaire) is ? mounted and measures ? deep. recessed / 14" × 14" × 8" - E1.3
17. How are the Q1 light fixtures mounted? Surface wall - E1.3
18. Why are the Type O3 lighting fixtures shown on Sheets E02.1 (1 of 4) and (2 of 4) darkened? The fixtures are supplied by the normal/emergency system.
19. What specific lighting control method is used for the Type W2 exterior light fixtures located outside and attached to the first floor of the office building? Use all four E02.1 drawings to answer the question. Photocell on and preset timer off
20. On the E03.1 plan, how many wires are needed to operate the EX103 garage door pushbutton? 4
21. The EX107 garage door motor is a 120-volt, single-phase ? motor. 1/3 hp - EO3.1 (2/4)
Created by: RealJW
Popular Engineering sets

 

 



Voices

Use these flashcards to help memorize information. Look at the large card and try to recall what is on the other side. Then click the card to flip it. If you knew the answer, click the green Know box. Otherwise, click the red Don't know box.

When you've placed seven or more cards in the Don't know box, click "retry" to try those cards again.

If you've accidentally put the card in the wrong box, just click on the card to take it out of the box.

You can also use your keyboard to move the cards as follows:

If you are logged in to your account, this website will remember which cards you know and don't know so that they are in the same box the next time you log in.

When you need a break, try one of the other activities listed below the flashcards like Matching, Snowman, or Hungry Bug. Although it may feel like you're playing a game, your brain is still making more connections with the information to help you out.

To see how well you know the information, try the Quiz or Test activity.

Pass complete!
"Know" box contains:
Time elapsed:
Retries:
restart all cards