Save
Busy. Please wait.
Log in with Clever
or

show password
Forgot Password?

Don't have an account?  Sign up 
Sign up using Clever
or

Username is available taken
show password


Make sure to remember your password. If you forget it there is no way for StudyStack to send you a reset link. You would need to create a new account.
Your email address is only used to allow you to reset your password. See our Privacy Policy and Terms of Service.


Already a StudyStack user? Log In

Reset Password
Enter the associated with your account, and we'll email you a link to reset your password.
focusNode
Didn't know it?
click below
 
Knew it?
click below
Don't Know
Remaining cards (0)
Know
0:00
Embed Code - If you would like this activity on your web page, copy the script below and paste it into your web page.

  Normal Size     Small Size show me how

B-General Building 2

Earthwork/Concrete

QuestionAnswer
The (Free) Underground Service Alert MUST be located within ____________ before excavation begins 2-14 days
If the Underground Service Alert is NOT notified due to negligence, a fine of _______ may be incurred $10,000
If the Underground Service Alert is NOT notified intentionally, a fine of _______ may be incurred $50,000
Underground Service Alert, WHITE paint = Proposed Excavation
Underground Service Alert, RED paint = Electrical Power Lines
Underground Service Alert, ORANGE paint = Communication/Alarm Lines
Underground Service Alert, PURPLE paint = Reclaimed Water, Irrigation
Underground Service Alert, PINK paint = Temporary Survey Markings
Underground Service Alert, YELLOW paint = Gaseous Materials
Underground Service Alert, BLUE paint = Potable Water
Underground Service Alert, GREEN paint = Sewers and Drain Lines
Fill Material must be compacted to at least 90%
Define Cohesive Soil More Compact and Self-Adhering, contains clay
Define Granular Soil Made up of Larger Particles, such as sand or rock
Type A Soil is highly ________, Type C Soil is highly _________, Type B Soil is inbetween Cohesive, Granular
The Width of Footings for 1,2 and 3 story buildings are 12, 15, 23
How long should Anchor Bolts be in a standard footing? 10 inches
What is the Basic rebar layout and sizes in a standard footing? 2 continuous #4 rebar with #3 ties every 48"
When Epoxying Rebar dowel rods to connect Existing footings with New ones, what is the size and spacing (4 rules) #4 Rebar, 6" into Old Slab, 12" into New Slab, 24" spacing
What are the required dimensions for an anchor bolt washer? 3" x 3"
There should be at least _______ of concrete surrounding rebar 2 inches
In the "Main Fields" of large slabs, what is standard Rebar Spacing 18"
What is the Standard overlap on Rebar 30 times the diameter
When is a slab required to have steel reinforcement? If it is to be used as a Living Area or Garage floor
When is a slab required to have a waterproof layer underneath? (plastic) If it is to be in or connected to a Living Area
What is the standard spacing requirements for Anchor Bolts? (4 rules) 4"-12" from the ends of Sill Plates, min. 2 per wall, 4' O.C for 2-story, 6' O.C for 1-story
What is the minimum size of Plastic that can be used as a water barrier on a slab pour 6 Mil.
Describe the Layers of dirt / plastic to be prepped underneath a Slab pour 3-4" of compacted dirt, plastic barrier, 1" minimum of clean sand
How far should an anchor bolt be set in the footing? 7 inches
All Concrete used for foundations/slabs should be ______ PSI minimum 2,500
How many feet of rebar must be encased in concrete to be used as a Grounding Rod 20 feet
Concrete does not completely cure until ______ from the pour 28 days
Concrete Joints should be placed how often 2-3 feet per inch of slab thickness (standard 4 inch slab every 8-12 feet)
The depth of a Concrete Joint should be _____ 25% the depth of the slab
Define a Control Joint The Joints typically used on slabs and sidewalks
Define a Construction Joint A Joint used to space out the concrete when the slab cannot be poured in one pour
Define an Isolation Joint A Joint used to space the concrete slab from other projects such as walls, columns, etc.
What tool do you use to conduct a "Slump Test" Abrams Cone
Created by: yobryan2009
Popular Human Services sets

 

 



Voices

Use these flashcards to help memorize information. Look at the large card and try to recall what is on the other side. Then click the card to flip it. If you knew the answer, click the green Know box. Otherwise, click the red Don't know box.

When you've placed seven or more cards in the Don't know box, click "retry" to try those cards again.

If you've accidentally put the card in the wrong box, just click on the card to take it out of the box.

You can also use your keyboard to move the cards as follows:

If you are logged in to your account, this website will remember which cards you know and don't know so that they are in the same box the next time you log in.

When you need a break, try one of the other activities listed below the flashcards like Matching, Snowman, or Hungry Bug. Although it may feel like you're playing a game, your brain is still making more connections with the information to help you out.

To see how well you know the information, try the Quiz or Test activity.

Pass complete!
"Know" box contains:
Time elapsed:
Retries:
restart all cards